
Add to Cart
1040,45# fixed flange,1040 flange,finish machining flange Forged Steel Flanges
Process procedure:
Forging process flow quality control: Raw material steel ingot into warehouse(test the chemical content) → Cutting→ Heating(Furnace temperture test) → Heat treatment after forging(Furnace temperture test) Discharge the furnace(blank inspection)→ Machining→ Inspection(UT,MT,Visal diamention, hardness)→ QT→ Inspection(UT, mechanical properties, hardness, grain size)→ Finish machining→ Inspection (dimension)→ Packing and Marking(steel stamp, mark)→ Storage Shipmen
Keywords:
Flange connection which are two pipes,pipe fittings or equipment to be fixed on one flange,then connect two flanges with flange gasket,finally use bolts to fasten two flanges,it’s demountable.
Advantage:
Reference:
Material | 1040,45# |
Weight | 110KG |
Application |
Fixed flange into the pressure vessel,includes fixed tube plate and movable tube plate |
Melting process | EF+LF+VD |
Production process |
Forging+heat treatment+rough machining |
Forging ratio |
≥5 |
Applicable standard | ASTM,ASME,DIN,JIS,ISO,BS,API,EN ,DIN |
Executive standard | JB/GB/EN/DIN/JIS/ASME/ASTM/ISO |
certificate authority | ISO,BV,SGS, IST, UL,CTI |
Delivery term |
Rough machining(N+T);finish machining(Q+T) |
Test equipment |
Spectrograph,UT device,tensile and impact test machine,metalloscope,outside micrometer,bore dial indicator,hardness test device,coordinate measuring machine |
Service | process, heat treatment, finish machining, package, local logistics, customers clearance and maritime transport. We took the customer’s requirements as the principal thing, and pay attention on the products quality. |
Custom properties:
Elements | C | Si | Mn | P | S | Cr | Ni | Mo | Cu |
1040 | 0.42-0.50 | 0.17-0.37 | 0.50-0.80 | ≤0.035 | ≤0.035 | ≤0.25 | ≤0.30 | ≤0.25 |
Mechanical property |
Dia.(mm) |
TS/Rm(Mpa) |
YS/Rp0.2(Mpa) |
EL/A5(%) |
RA/Z(%) |
Type Of notch |
Impact energy |
HBW |
1040 | Ø25 | ≥600 | ≥355 | ≥16 | ≥40 | V | ≥39 | ≤229HBS |
Commerce clause:
Max weight | 30T |
MOQ | 1PC |
Delivery date | 15-50 days |
Package | wooden case,pallet,iron frame |
Delivery term | FOB;CIF;CFR;DDU; |
Payment term | T/T,LC |
Transportation | Ocean ,air |